UPS Graceful Shutdown and Infrastructure Resilience Test
Resolved
Jun 27, 2026 at 7:45pm UTC
Maintenance ended
Affected services
Created
Jun 27, 2026 at 3:45pm UTC
We are performing a planned test of our Uninterruptible Power Supply (UPS) automated shutdown sequence.
The goal of this maintenance is to verify the integrity of our graceful shutdown ladder across our Proxmox cluster and TrueNAS storage node.
Impact:
All services hosted on the Proxmox nodes will be temporarily unavailable during this window.
Storage services provided by the TrueNAS node will be inaccessible.
We expect the services to return to normal operation shortly after the test concludes and systems are powered back on.
We appreciate your patience as we ensure the reliability and safety of our infrastructure power management.
Affected services